Teratec Construction Report: Gymnasium
Solving your problems at the gym! Introducing "TerraTech" case studies for settlement correction and void filling.
We would like to introduce a case where we solved issues related to subsidence and voids in a gymnasium using the Teratec method. 【Issue】 We received a consultation from a public elementary school in Ise City, Mie Prefecture, stating that "the gymnasium floor is sinking." 【Reasons for Choosing Teratec】 - Short construction period and low cost - Minimal waste as the floor does not need to be destroyed 【Feedback After Construction】 During the summer vacation, we carried out large-scale subsidence correction work and successfully leveled the entire gymnasium. ■ For more details, please visit https://teretek.jp/plus/case/gym *For more information, please refer to the external link or feel free to contact us. Toll-free number: 0120-873-835
- 企業:メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡
- 価格:Other